Seven Bridges Built on the Akwanga 54 km Road in Nasarawa

The Akwanga road project included seven reinforced and prestressed concrete bridges, with a total bridge length of 250 m. Two of these are prestressed concrete (PSC) bridges incorporating 30 m spans.


Key facts

  • Bridges: 7 reinforced and prestressed concrete bridges, 250 m in total length
  • Prestressed bridges: 2 PSC bridges incorporating 30 m spans
  • Structural concrete: 36,802 m³ (bridges, box culverts, retaining structures)
  • PSC girder concrete: 605 m³ precast / prestressed
  • Reinforcement steel: 2,396 tonnes
  • Bearings and joints: 90 elastomeric bearings, 104 m of expansion joints

Designed in-house

ICCO carried out the structural design of the bridges and culverts as part of the contract's design and engineering scope. It also prepared the drawings, calculations and construction documentation used on site.

Handling design and construction together means the people who build each bridge work from drawings made by the same team, which helps problems get resolved quickly on site.

Concrete and steel

Building the bridges, box culverts and retaining structures called for large volumes of materials:

Item Executed quantity
Structural concrete – bridges, box culverts and retaining structures 36,802 m³
Precast / prestressed concrete for PSC bridge girders 605 m³
Reinforcement steel for structural works 2,396 tonnes

Reinforcement steel gives concrete the strength to resist bending and cracking under load. In the PSC girders, the steel is tensioned so that the concrete is held in compression, allowing longer spans.

Why prestressed spans matter

Prestressed girders can span 30 m with fewer supports in the waterway. Fewer piers mean less obstruction to water flow, which reduces the risk of scour around the foundations during heavy rain.

Scour is the washing away of soil around a foundation by fast-moving water. It is one of the main causes of bridge damage in flood conditions, so a design that puts fewer piers in the channel helps the structure last.


Bearings and joints

ICCO installed 90 elastomeric bridge bearings and 104 m of bridge expansion joints.

Item Executed quantity
Elastomeric bridge bearings 90
Bridge expansion joints 104 m

Bearings sit between the deck and its supports, carrying the load while letting the deck move slightly. Expansion joints allow the deck to grow and shrink with temperature without damaging the road surface.

Certified with the full 54 km

The bridges were completed as part of the full 54 km scope. The Nasarawa State Urban Development Board certified the works complete in April 2022, confirming they met the approved drawings and technical specifications.

More on the Akwanga 54 km road

This article is part of a five-part series on the project:

Frequently asked questions

How many bridges are on the Akwanga 54 km road?

There are seven reinforced and prestressed concrete bridges with a total bridge length of 250 m. Two of them are prestressed concrete (PSC) bridges incorporating 30 m spans.

Who designed the bridges?

ICCO carried out the structural design of the bridges and culverts as part of the contract, and prepared the drawings, calculations and construction documentation.

Why use prestressed girders?

Prestressed girders can span 30 m with fewer supports in the waterway. Fewer piers mean less obstruction to water flow, which reduces the risk of scour around the foundations.

What do bearings and expansion joints do?

Bearings carry the deck's load while letting it move slightly. Expansion joints allow the deck to grow and shrink with temperature without damaging the road surface.